Location

Conchan is a private pier owned by Cementos Lima. Located at playa Conchan about 25 nm south of Callao. It’s an off shore terminal in an area which has 10 miles of open sea, without geographical accidents.

Arrival
All vessels to Conchan pier must arrive first to Callao p.s. where authorities will board the vessel for reception purposes and where pilot will take her to Conchan. Pilotaje is compulsory steaming time Callao/Conchan abt 3 hours.

Restrictions
Max Loa 185/190 mts – max beam 32 mts – max draft 11 mts sw. max vessel´s dwt 38,000 mt. Vessel must have on board min 15 nylon mooring lines in good conditions. Wire ropes as mooring lines not allowed. Vessel must have chain strands ( 11 shackles). The pier allows ships mooring only by the west side.

Berthing operations only allowed during daylight. Unberthing allowed atdnshinc.

Loading
The usual rate for loading bulk cement / clinker is about 8/10000 mt per day normally performed shinc. Cargo stored at silos is discharged onto a 1 km conveyor belt which feeds a shiploader. No cement holes are required. No shifting required between berths.

Conditions of Port / Swell
Master must maintain enough crew on deck to keep lines tight at all moments. Ships must keep main engines on stand-by during operations. During periods of strong but controllable swell, while load, a pilot must remain on board / at the pier area at ship´s expenes. Swell can affect Conchan pier normally for a period of 24/ 48 hrs. During winter time, from June to August there are more poss that swell affects loading operations.

 